Risk Analysis and System Trades inthe Mars Sample Return (MSR) Mission

1997 
Risk Managenent advocates have long sought to directly influence the early stages of the systems engineering process through a more effective role in system design trade studies. The principal obstacle to this has been the lack of credible ways to represent and quantify mission risk that is, missios return form a probablistic viewpoint-for the project manager and the rest of the design team.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []