EUROTUNNEL '83. PAPERS FROM THE EUROTUNNEL '83 CONFERENCE HELD IN BASLE, SWITZERLAND JUNE 22-24 1983

1983 
The following papers are included: The Las Planas Tunnel: Analysis and Control of the Second Freeway Tunnel (Bailly, JC, Bouvard, A and Colombet, G); The design and Construction of the Ahmed Hamdi Tunnel, Suez (Lyons, AC and Harries, DA); Construction of the "Westtangente" Motorway Tunnel in Bochum Under Extremely Difficult Environmental Conditions (Steinheuser, G and Maidl, B); Excavation of Sewer Tunnels with Small Diameter Shields in Turin (Dapporto, F, Fornaro, M, Innaurato, N and Mancini, R); The Paijanne Water Tunnel (Pokki, E, Heinio, M and Lehmuskallio, S); Behaviour of the Concrete Lining in the Kielder Water Tunnels (Tedd, P and Masterton, GGT); Time-Dependent Behaviour of Lined Tunnels in Soft Rocks (Berest, P and Nguyen Minh, D); The Underground Disposal of High Level Radioactive Wastes (Bubbers, BL and Allison, JA); Construction of an Underground Laboratory in a Deep Clay Formation (Funckin, R, Gonze, P, Vranken, P, Manfroy, P and Neerdael, B); Geophysics Along the Frejus Motorway Tunnel (Armando, EG). (continued on TRIS abstract no. 379299). (TRRL)
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []