ABB Combustion Engineering, Inc. is one of three contractors executing Phases 1, 2 and 3 of the Department of Energy project entitled Engineering Development of Advanced Coal-Fired Low-Emission Boiler Systems (LEBS). Phase 1 has been completed and Phase 2 is scheduled for completion on September 30, 1996. The following major activities are being carried out in parallel in Phase 2 and this paper is a status report on this work: (1) in-furnace NOx reduction; (2) catalytic filter optimization; (3) add Kalina cycle to POCTF; and (4) POCTF design and licensing. The in-furnace NOx reduction work has been completed and, therefore, a description of this work comprises the major part of this paper.