Status of the ITER vacuum vessel construction

2014 
Abstract The ITER vacuum vessel (VV) is under manufacturing by four domestic agencies after completion of engineering designs that have been approved by the Agreed Notified Body (ANB). Manufacturing designs of the VV have been being completed, component by component, by accommodating requirements of the RCC-MR 2007 edition. Manufacturing of the VV first sector has been started in February 2012 in Korea and in-wall shielding in May 2013 in India. EU will start manufacturing of its first sector from September 2013 and Russia the upper port by the end of 2013. All DAs have manufactured several mock-ups including real-size ones to justify/qualify and establish manufacturing techniques and procedures.