Production method of pile foundation for model test

2016 
The invention provides a production method of a pile foundation for a model test. The production method comprises the following steps: building a device, fixing a model pile, marking, mounting a strain piece, recording, collecting data, unloading, and carrying out coating, calibration and the like. The method is applied to the works of strain piece adhesion, patch quality detection, strain piece lead arrangement, model pile outer wall coating, whole pile calibration after the coating and the like, the position of the strain piece on the outer wall of the model pile and the lead is facilitated, and the coating of the whole pile can be realized. The method is precise, efficient and applicable to model piles with relatively high rigidity and can be widely applied to the fields of processing and detection of the model piles.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []