language-icon Old Web
English
Sign In

The Case for Sihl Dam

2018 
This chapter presents a case and results that were undertaken at the request of the Swiss Risk Engineering Company, regarding the potential consequences of a virtual Sihl Dam break event. Note that the modeling is limited to a ‘worst case scenario’ describing a full destruction of the dam wall within a short time span and the consequent release of the whole water reservoir volume. To compare results and show the strength of the proposed model and the associated decision support system, a similar consequence assessment published on the Internet by the Polizei department, Zurich was used as a frame of reference.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    0
    Citations
    NaN
    KQI
    []