Primary-secondary pumping conversion: Retrofit of an existing campus chilled water distribution system

1996 
The chilled water distribution system within an existing 8,300 ton (29,200 kW) capacity regional chilled water plant at Michigan State University (MSU) is being converted from a primary pumping arrangement to a primary-secondary arrangement. The plant presently provides chilled water for air conditioning to twelve remote buildings. In the future, MSU plans to increase the plant`s capacity to 10,800 tons (38,000 kW) in order to serve seven more buildings. The addition of buildings to the distribution system has caused the existing primary pumps to be incapable of producing enough pressure to offset system losses at design flow rates. The existing system has become unable to concurrently provide adequate flow, design supply water temperature and efficient chiller operation due to the distribution system deficiencies. The primary-secondary pumping conversion will include modifications to the distribution piping, the addition of five variable speed secondary pumps, additions and modifications to the control systems, the trimming of impellers on six of the existing primary pumps and replacement of two primary pumps. The campus central control system will be utilized to provide automatic chiller staging, interface with the packaged secondary pump control systems, and control of the building interconnections. The total construction cost is approximately $1,400,000more » and is scheduled for completion prior to the 1996 cooling season. Provisions have been made for two additional secondary pumps to accommodate the connection of additional buildings to the distribution system in the future.« less
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []