Analysis and Countermeasures for Risks in Shield Boring in Fine Silty Sand Ground

2009 
Taking the shield boring of Nanjing Metro in fine silty sand ground as an example,the author analyzes the main risks in tunnel boring and summarizes the construction countermeasures,particularly in aspect of water inflow,sand inflow,ground surface settlement and building/structure deformation.In the end,the risks have been brought under effective control.The countermeasures presented in the paper,especially those for shield boring under brick-masonry workshops without foundations,can provide reference for similar projects in the future.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []