Development of a Vertical Recirculation Well System for the A/M Area of the Savannah River Site
1996
The objective of this work is to examine and develop a remediation scenario to provide long term hydraulic control and remediation of the dissolved chlorinated solvent plume within the Western and Southern Sectors of the A/M Area. This scope includes the development and siting of a remediation system that will contain the 500 part per billion trichloroethylene isoconcentration contour within each sector.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
4
Citations
NaN
KQI