Detailed analysis of the ANO-2 turbine trip test

1983 
A RELAP5/MOD1 (Cycle 18) computer code simulation of the ANO-2 turbine trip test from 98% power level was performed for use in vendor code qualification studies. Results focused on potential improvements to simulation capabilities and plant data acquisition systems to provide meaningful comparisons between the calculations and the test data. The turbine trip test was selected because it resulted in an unplanned sequence of events that broadly affected the plant process systems and their controls. The pressurizer spray valve stuck open at an undetermined flow area, and an atmospheric dump valve remained stuck fully open while several atmospheric dump and secondary side safety valves were unavailable throughout. Thus, although the plant remained always in a safe condition, this transient potentially provided an unusual set of data against which the fidelity of a NSSS simulation by RELAP5/MOD1 along with certain vendor analysis codes might be judged.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []