Control Rod Trip Failures; Salem 1, the Cause, Response, and Potential Fixes

1984 
The objective of this paper is to address the systems and reliability analysis of recent nuclear reactor control rod failure-to-trip (or scram) events that have been experienced in the U.S. commercial nuclear industry. This viewpoint will introduce the operational factors of hardware, procedures, and the human into the analysis of transients without scram.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    2
    Citations
    NaN
    KQI
    []