Process control strategy for ITER central solenoid operation

2016 
Abstract ITER Central Solenoid (CS) pulse operation induces significant flow disturbance in the forced-flow Supercritical Helium (SHe) cooling circuit, which could impact primarily on the operation of cold circulator (SHe centrifugal pump) in Auxiliary Cold Box (ACB). Numerical studies using Venecia®, SUPERMAGNET and 4C have identified reverse flow at the CS module inlet due to the substantial thermal energy deposition at the inner-most winding. To assess the reliable operation of ACB–CS (dedicated ACB for CS), the process analyses have been conducted with a dynamic process simulation model developed by Cryogenic Process REal-time SimulaTor (C-PREST). As implementing process control of hydrodynamic instability, several strategies have been applied to evaluate their feasibility. The paper discusses control strategy to protect the centrifugal type cold circulator/compressor operations and its impact on the CS cooling.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    8
    References
    2
    Citations
    NaN
    KQI
    []