The reasonable scale of water reuse system in irrigation area: a case study of Chitong irrigation district in Taiwan
2013
The aim of this study is to assess the potential of the irrigation return-flow in a water reuse system, for the supply of other local water users. Both field survey and water-budget analysis were conducted, and the Chitong irrigation district in Taiwan was selected as the case study area. The results indicate that through the regulation of a pond with the effective capacity of 20,000 m3, a stable supply of 10,000 CMD of reuse water can be generated if the return-flow from the irrigation area of 200 hectares, which is about the size of a rotation plot, is intercepted. However, as the irrigation and effective rainfall are low from December to March, which are considered high risk for water supply, the irrigation return-flow decreases accordingly, and a series of responding measures are also suggested.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
5
References
5
Citations
NaN
KQI