Core design of the upgraded TREAT reactor
1982
The upgrading of the TREAT reactor involves the replacement of the central 11 x 11 subzone of the 19 x 19 fuel assembly array by new, Inconel-clad, high-temperature fuel assemblies, and the additions of a new reactor control system, a safety-grade plant protection system, and an enhanced reactor filtration/coolant system. The final design of these modifications will be completed in early 1983. The TREAT facility is scheduled to be shut down for modification in mid-1984, and should resume the safety test program in mid-1985. The upgrading will provide a capability to conduct fast reactor safety tests on clusters of up to 37 prototypic LMFBR pins.