Application of Visual Simulation to Optimize Tunnel Schedule Engineering

2009 
The methodology of visual simulation for tunnel engineering construction schedule is presented, visualization of simulation model, calculation and result of construction schedule simulation is realized, the construction simulation of tunnel engineering can be done, the resource optimization of tunnel engineering construction schedule is taken. Meanwhile, risk analysis and decision-making method of tunnel engineering construction schedule based on visual simulation is presented. Furthermore, by using of S curve theory and schedule management method, tunnel engineering construction schedule S curve real time management and control method based on visual simulation is presented; the successful application to the tunnel engineering construction schedule analysis and management demonstrates the feasibility and effectiveness of the method presented in this paper. This electronic document is a "live" template.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    3
    References
    2
    Citations
    NaN
    KQI
    []