Erst lackieren, dann montieren Oberflächentechnik im Ablaufplan

1993 
For many years, Mannesmann Demag have been constructing building machinery and telescopic cranes for load categories of over 100 tons. In order to provide a more versatile program to customers, the firm decided to set up a production plant for smaller cranes for a load range of from 30 to 100 tons. At Zweibrucken, cranes are first coated and then assembled. Integration of the bottleneck produced by just-in-time surface techniques necessistated a reversal of the production sequence
    • Correction
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []