The concrete dam and rock foundation of the Zeya hydroelectric station after operating for 6 years, during which the reservoir was filled to the NPL and in some years somewhat exceeded it, is in a satisfactory state. 2. The behavior of the dam under the effect of the operating loads and climatic factors correspond to the design assumptions. 3. The indices of the state of the Zeya buttress dam give grounds to state that dams of the given type are prospective for use under conditions of a harsh climate.