Hill guided flush cut mud reclamation and construction method of curing treatment

2014 
Hill guided flush cut mud reclamation curing treatment and construction method, comprising the steps of: build a narrow area in the valley downstream; the construction of multi-stage drainage wells earth; Peak excavation guide groove; into the water guide groove and dozing; soil mix into the slurry and a curing agent; pumped from drainage wells; to fill an upper portion of the slurry; rolling fill level and spread. The invention belongs to the field of manufacturing technology to cut the mountain, the mountain is suitable for the city to expand land space projects, new ideas, reaching shorten the construction period and reduce the project cost and less environmental pollution aim to promote water will cut the mountain reclamation technology in municipal engineering development of.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []