Structural Integrity Assessment of Shield Tunnel Crossing of a Railway Bridge using Orthogonal Experimental Design

2020 
Abstract This paper focuses on the specific project of shield construction across the existing Wuzhun Railway Bridge between Xuanrendun Station and Dadiwobao Station on Urumqi Metro Line 1. A three-factor and four-level model of the Wuzhun Railway Bridge foundation reinforcement scheme is designed based on the principle of the orthogonal experiment. The calculation of each reinforcement scheme is conducted by using FLAC3D numerical simulation software. The optimal reinforcement scheme of the Wuzhun Railway Bridge foundation through orthogonal design-direct analysis and variance analysis is obtained. The reinforcement of the Wuzhun Railway Bridge is carried out according to the optimal scheme, and the rationality of the reinforcement scheme is verified by comparing and analyzing the numerical simulation data with the monitored data received from the construction site. The research results serve as a guide in the construction of future tunnel shield crossings for the existing railway, and the developed research methodology provides a reference for similar tunnel crossing projects.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    11
    References
    10
    Citations
    NaN
    KQI
    []