Results of NSLS-II linac commissioning

2013 
The NSLS-II linac is a 200 MeV normal conducting linac procured as a turnkey system from RI Research Instruments, GmbH. The linac and associated transport lines were installed at BNL in the winter of 2012. Commissioning activities started March 26, 2012 and lasted for 2.5 months. In this report we discuss the commissioning results of the linac and issues encountered.