Short Period, Large Aperture PPRKTP via Coercive Field Engineering: Key Parameters

2021 
We demonstrate large aperture PPRKTP with a period as short as 3.43 m fabricated via coercive-field engineering through ion-exchange. The key parameters to achieve high-aspect ratio domain structures are discussed.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []