Short Period, Large Aperture PPRKTP via Coercive Field Engineering: Key Parameters
2021
We demonstrate large aperture PPRKTP with a period as short as 3.43 m fabricated via coercive-field engineering through ion-exchange. The key parameters to achieve high-aspect ratio domain structures are discussed.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI