Engineering Design and Analysis of the CFETR Divertor Remote Maintenance System

2020 
A China Fusion Engineering Testing Reactor (CFETR) will be built to test and verify the feasibility of engineering and technology in practice for the future fusion reactor. Long pulse and steady-state operation will be demonstrated with duty cycle time more than 30%–50%. Because of the beta and gamma activation of the component bulk and surface dust (beryllium, carbon, and tungsten), special remote handling (RH) techniques will be required during machine maintenance periods. The divertor cassettes’ remote replacement is one of the key maintenance operations for the CFETR to meet the requirements of duty cycle time. RH maintenance strategies will have a significant impact on the layout of the machine and design of components. In this article, an overview of the CFETR divertor components’ remote maintenance strategy and the description of the maintenance process of the divertor cassettes were introduced. The engineering design features of the divertor RH systems (DHRSs) were described to meet the requirements such as high efficiency and reliability. Preliminary assessment of the divertor RH system is done in order to successfully and efficiently carry out RH maintenance tasks.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    12
    References
    0
    Citations
    NaN
    KQI
    []