Redesign Layout Planning of Raw Material Area and Production Area Using Systematic Layout Planning (SLP) Methods (Case Study of CV Oto Boga Jaya)

2020 
CV Oto Boga Jaya (Oto Bento) is one of the largest industries which is producing Japanese food that is located in Bogor City and has many franchise partners throughout Indonesia. CV Oto Boga Jaya has the most significant problem and complained by most employees and operators (interview results) is a matter of factory layout between the raw material warehouse and the production area where the position of the two departments has an excess of more than 29 meters and takes time more than 10 minutes for one move. Therefore, researcher conducted observations and data processing with systematic layout planning (SLP) methods to design a new factory layout for CV Oto Boga Jaya. The processed data is the Operation Product Chart (OPC) data by selecting the product that has the highest and longest production process named shrimp roll, routing sheet, material handling costs, and initial layout as a reference. Then after conducting the research, the results obtained are in the form of 2 alternative layouts with distances and positions of different departments that have been processed in the FTC, ARC, ARD, AAD. The results of this study were chosen alternative layout 2, because it has shorter inter-departmental distances, a more orderly production / administration process, and fewer room intersections compared to alternative layout 1.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    1
    References
    1
    Citations
    NaN
    KQI
    []