Operational readiness/risk assessment at the waste isolation pilot plant

1988 
The Waste Isolation Pilot Plant (WIPP) is currently preparing to enter its operational phase. In preparation, a risk-based management (RBM) program is being developed to ensure maximum safety and reliability of all aspects of facility operation. Training of workers, preparation of procedures, and development of emergency action plans are examples of activities currently being performed. The RBM program will verify the safety and operability of the facility prior to startup. Planned as part of the RBM is the selective application of the following risk assessment technologies: 1. operational readiness reviews, 2. vulnerability analyses, 3. safety analyses, 4. probabilistic risk assessments, 5. risk/benefit analyses. These tools provide a meaningful risk and operability analysis for startup and a useful end product for managing safety during facility operation.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []