Middle beam pad iron assembly in anchor rod construction

2007 
A middle beam padding iron subassembly for anchor construction comprises a middle beam, a middle beam padding iron and a reinforce armor plate are arranged on the middle beam. The utility model has easy choice of material, can choose material by middle beam material used. The blank size is easy to master, welding the middle beam as an integer after blanking, supporting against the breast wall pile, reduces the span of the middle beam, makes the bracket acting totally; the matched reinforce armor plate on the front and the back of the middle beam can reinforce the whole stiffness of the middle beam, increase the section resistance distance, reduces the negative bending moment of end part, prevents torsion of the middle beam, supplement each other with the middle beaming padding iron, using the combination subassembly, the user can master easily, reduces the project cost of the whole anchor construction greatly, resolves more efficiently the problem of distortion of the middle beam in the anchor project, ensures the construction schedule, ensures the efficiency of the builder in the process of spreading and drawing more efficiently, reduces the whole construction cost, can used widely in foundation pit anchor and anchor cable construction, the utility model is a convenient and efficient construction tools.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []