Power supply for the Spanish Stellarator TJ-II, design, construction and tests

1995 
Most of the components of the electrical power supply system of the new TJ-II stellarator, which is under construction in Madrid (Spain), are now constructed and tested. The flywheel synchronous generator is still under construction and its tests are planned for the end of 1995. The power plant is described in detail as well as the tests which have been carried out and their results.