Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof

2014 
The invention relates to a truss frame of a steel structural transfer floor of a high-rise building, particularly to a sliding device and a lifting device for the truss frame of the steel structural transfer floor of the high-rise building and a construction method thereof, which can be applied in steel structures. The sliding device and the lifting device comprise a track mechanism, a sliding jig frame mechanism and a sliding mechanism, wherein the sliding jig frame mechanism matched with the track mechanism is arranged on the track mechanism; the sliding jig frame mechanism can be stretched through the sliding mechanism; The construction method comprises the following steps of arranging the sliding track and the jig frame of the truss frame, enabling the truss frame to slide on the ground and finally lifting a single-frame truss frame. According to the sliding device and the lifting device for the truss frame of the steel structural transfer floor of the high-rise building and the construction method thereof, the structure is compact, resources are saved, and the construction is safe, and the control is easy.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []