A technique for assembling a large revolving crane on a crane ship adopts the following installation steps: 1) drawing lines on the deck of a crane ship body, 2) fixing a deck cylinder (141) on the deck of the crane ship body in a welding mode, 3) arranging a lower revolving support 1, 4) arranging a jacking fuel cylinder (10), 5) arranging a revolving chassis (2), 6) arranging a weight box (7), 7) arranging a truss frame (3), 8) arranging a machine room (8), 9) arranging an amplitude platform (9), 10) arranging a bipod (4), 11) arranging a crane jib shelf (13), 12) arranging a crane jib (5), 13) arranging an amplitude control mechanism (91), 14) arranging a main hook (11), a steel rope (111) of a main hoisting mechanism and an auxiliary hook (12), 15) assembling all control mechanisms in the machine room (8) and parts under control. In the present invention, a large revolving crane is directly arranged on the crane ship. Installation speed is accelerated, the labour intensity of operating personnel is reduced, and meanwhile, the whole hoisting capability of the crane is improved. Large platform blocks can be integrally built. The design of integral hoisting reduces execution difficulty and offshore operation risks, shortens work periods and improves economic benefit.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []