IDENTIFIKASI FAKTOR – FAKTOR UTAMA PENYEBAB TERJADINYA KETERLAMBATAN PADA PELAKSANAAN YANG MEMPENGARUHI WAKTU PENYELESAIAN PEKERJAAN INFRASTRUKTUR GEDUNG DI KOTA BANDA ACEH

2020 
In the implementation of building construction projects in the city of Banda Aceh in the Fiscal Year 2015 to 2017, many experienced delays in the implementation caused by many factors both internal factors and external factors that have an impact on delays in project completion time, so that the project is not completion according to time has been determined in the contract document which is a written agreement between the owner and the contractor. This research was conducted with the aim to find out the top 5 (five) rangkings of the the main factors that caused the delay in the implementation of buiding construction project in Banda Aceh City and to get the main factors that can be done to prevent/overcome delays in the implementation of building construction projects in Banda Aceh City. Data collection was conducted by questionnaire survey method to 40 respondents from the owner and 40 respondents from the contractor who had been involved in handling building construction projects. Based on the results of data analysis and discussions that have been carried out, it is determined that the top 5 (five) ranks of the main factors causing the delays in implementation of the building construction project in city of Banda Aceh are: Design changes/work details at the time of implementation, natural disasters such as fires, flood, bad weather, storm/hurricane, earthquake, landslide, etc; Conditions and environment that are not as expected; Wrong/incomplete in making planning (drawings/specifications); and Often/ lot of work is added/less. While the top 5 (five) ranking solutions for the main factors that can be done to prevent/overcome delays in implementation of building construction projects in Banda Aceh City are: Reviewing the design before strarting wortk; Knowing weather prediction during implementation; Conducting feasibility studies and field investigations before the execution of work; During the Pre Construction Meeting the contractor must clarily all documents to be clear; and Minimize the occurrence of added/less work.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []