Longwall in Wyoming
2007
The article describes development of a longwall operation at Pacific Corp's Jim Bridger mine in Wyoming, USA. The lease acquisition and permitting process began in late 2003 and the longwall operations began on 5 March 2007. The quality is between sub and bituminous coal. The mine is shallow and the surrounding rock is weaker than longwall mines in Colorado or Utah. DBT supplied the longwall system comprising 1.75 m shields, a 1 m wide face conveyor and a DBT EL200 shear with a 1-m web. The mine also operates a highwall unit and two draglines. 4 photos.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI