PROGRESS OF THE STOCHASTIC COOLING SYSTEM OF THE COLLECTOR RING

2013 
An overview of the recent achievements and ongoing developments for the stochastic cooling system of the Collector Ring is given. In focus are the hardware developments as well as the progress in predicting the system performance. The system operates in the frequency band 1-2 GHz, it has to provide fast 3D cooling of antiproton, rare isotope and stable heavy ion beams. The main challenges are (i) the cooling of antiprotons by means of cryogenic movable pick-up electrodes and (ii) the fast two-stage cooling (pre-cooling by the Palmer method, followed by the notch filter method) of the hot rare isotope beams (RIBs). Recently, a novel code for simulating the cooling process in the time domain has been developed at CERN. First results for the momentum cooling for heavy ions in the CR will be shown in comparison with results obtained in the frequency domain with the Fokker-Planck approach.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []