Closed-circuit television and remote crane control for vitrification facilities

1986 
The Defense Waste Processing Facility is currently under construction at the Savannah River Plant. Within the main process cell (MPC), a 117-ton capacity bridge crane is to be installed to facilitate remote handling and processing operations. E. I. du Pont de Nemours and Company defined and PRC designed and built an operational prototype closed-circuit television (CCTV) and remote control system. Phase I of the program developed the CCTV system to prove the feasibility of a remote viewing system. The phase II program added full crane functional remote control and installed it on an existing hot canyon crane. This prototype system established the criteria for the development of the MPC crane and future crane systems. Parameters were: (a) failsafe assurance, (b) high liability, (c) ease of maintenance for dressed-out personnel, (d) rapid malfunction diagnosis, (e) ergonomics, (f) known picture orientation, and (g) audio system to monitor operational sounds. The complete system has undergone a total demonstration of its operational capabilities using simulator circuits for crane functions and is now being integrated with the crane for a full operational demonstration. The system will then be mothballed pending installation by construction personnel ready for cold startup of the plant in 1988.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []