Cold- and beam test of the first prototypes of the superstructure for the TESLA collider

2003 
After three years of preparation, two superstructures, each made of two superconducting 7-cell weakly coupled subunits, have been installed in the TESLA Test Facility linac (TTF) for the cold- and beam test. The energy stability, the HOMs damping, the frequency and the field adjustment methods were tested. The measured results confirmed expectation on the superstructure performance and proved that alternative layout for the 800 GeV upgrade of the TESLA collider, as it was proposed in TDR, is feasible. We report on the test and give here an overview of its results which are commented in more detail elsewhere in these Proceedings.