Research on the BDAR Supporting Unit's Scheduling Based on Interrupt Procedure
2009
During the BDAR (Battlefield Damage Assessment and Repair) Supporting Unit supports repairing the damage- equipments in multi-battlefield locales, some other locales may also ask for supporting. Aimed to the BDAR Supporting Unit's scheduling problem of this dynamic battlefield, a scheduling method based on the interrupt procedure like in computer technology is proposed in this paper. This can guarantee the maximum fighting power recovery rate after each supporting repair to the damage-equipments. Furthermore, the repair interrupt priority determining method proposed in the paper also can be the criterion of the BDAR Supporting Unit deciding the supporting order of damage-equipments in multi-battlefield locales. And finally, this method is proved useful and feasible by an application example.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
1
Citations
NaN
KQI