Impedance study for the PEP-II B-factory

1995 
The paper summarizes results of the impedance studies of the components of the B-factory. The prime goal of this activity was to support the design of the vacuum chamber and, at the same time, to get reasonable model of the machine impedance, which can be used later for detail studies of collective effects.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    5
    Citations
    NaN
    KQI
    []