An improved quasi-rhythm method to forecast the annual side inflow to the reservoirs of the Volga-Kama Hydropower Plants Cascade

2017 
It was shown that an improved quasi-rhythm method can make it possible to predict the annual side inflows into the hydrological sections of the Volga-Kama Hydropower Plants (HPP) Cascade with a one-year lead time with high quality and good forecast verification.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    3
    References
    0
    Citations
    NaN
    KQI
    []