language-icon Old Web
English
Sign In

V & V of MuSES 6.0 Status Report

2002 
Abstract : MuSES 6.0 was released late in 2001. TARDEC has undertaken a formal verification and validation procedure as described in the Army Modeling and Simulation Office Pamphlet 5-11 and as described in the Defense Modeling and Simulation Offices Guidelines on the subject. The full report is expected to be finished in the Fall of 2002. This paper will give examples of the latest results of the tell environment Cubi tests and additional verification and validation tests. In addition the paper will discuss some of the lessons learned on the V&V of engineering level models.
    • Correction
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []