Modernization of USS/KOBE No. 3 blast furnace

1993 
The USS/KOBE Steel Company was formed on July 1, 1989 as a joint venture between USS and KOBE Steel of Japan. A major premise of the joint venture was to use generated capital for the modernization of the plant's facilities. The first major project of the new company was the total renovation of No. 3 Blast Furnace. This furnace is to be the mainstay of quality hot metal production for the future of the new company. No. 3 Blast Furnace was last operated in 1982. An original reline was planned in 1981, but was deferred due to economic conditions. Subsequent dismantling and engineering were performed in 1985 but the facility basically laid dormant for ten years until 1991. This paper discusses the various systems installed during the furnace rebuild along with some of the construction aspects of the rebuild along with some of the construction aspects of the rebuild. Modernized USS/KOBE No. 3 Blast Furnace (Blow-in: May 4, 1992) introduced various improvements of equipment and technology, such as a Paul Wurth Top, coke screening, casthouse, gas cleaning, stoves, and automatic stockhouse in order to make it a world class competitor.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []