Traffic service position system no. 1: Operator training facilities
1979
The evolution of operator training facilities for tsps No. 1 has involved the development of new program-controlled positions which have much greater flexibility and reliability than preceding training equipments. These procon-controlled positions and associated facilities are now the standard means for training tsps operators. Coincident with the development of these facilities, a minicomputer system for generating master training tapes was designed to facilitate the generating of new training tapes and modifying existing ones to add new operating features.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
1
Citations
NaN
KQI