The TRIUMF kaon factory accelerators

1990 
To accelerate a 100 µA proton beam from the TRIUMF H- cyclotron to 30 GeV a five-ring accelerator complex is proposed. Each accelerator is followed by a storage ring for time-matching - the cw cyclotron by the Accumulator, the 3 GeV 50 Hz Booster by the Collector, and the 30 GeV 10 Hz Driver by the Extender - the latter providing the slow-extracted beam for coincidence experiments. Under the current $11 million preconstruction study prototypes are being built of various components of the Booster ring - a fast-cycling dipole magnet, a dual-frequency magnet power supply, ceramic beam pipes, rf cavities (both parallel and perpendicular bias versions) and an extraction kicker. In addition the lattice designs for all five rings and the shielding and remote handling requirements are being reviewed. These activities will allow construction to start in 1990.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    11
    References
    1
    Citations
    NaN
    KQI
    []