Avionics Integrity Program (AVIP). Volume 1. Procurement Phase Issues - Design, Manufacturing, and Integration

1984 
Abstract : This report addresses program phases of design, manufacturing and integration. It includes assessments of methodologies of work which can be used to develop a proven, tolerant product capable of withstanding the use environment. The goal of the process described is to eliminate defective piece parts, processes and final product, prior to delivery to the purchasing activity. A tolerable systems engineering process, dealing with activities that are known to take place during each phase can be developed through use of the material provided.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []