SIMULATION BASED OPTIMIZATION OF A COLLIMATOR SYSTEM AT THE PSI PROTON ACCELERATOR FACILITIES

2010 
A simulation based optimization of a collimator system at the 590 MeV PSI proton accelerator is presented, for the ongoing beam power upgrade from the current 1.2 MW [2 mA] towards 1.8 MW [3 mA]. The collimators are located downstream of the 4 cm thick graphite meson production target. These are designed to shape the optimal beam profile for low-loss beam transport to the neutron spallation source SINQ. The optimized collimators are predicted to withstand the beam intensity up to 3 mA, without sacrificing intended functionality. The collimator system is under the heavy thermal load generated by the proton beam power deposition of approximately 240 kW at 3 mA, and it needs an active water cooling system. Advanced multiphysics simulations are performed for a set of geometric and material parameters, for the thermomechanical optimization of the collimator system. In particular, a FORTRAN subroutine is integrated into CFD-ACE+, for calculating local beam stopping power in the collimator system. Selected results are then compared with those of full MCNPX simulations.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    3
    Citations
    NaN
    KQI
    []