SHARAQ Spectrometer—Current status and future experimental plans—

2010 
The high‐resolution SHARAQ spectrometer and the dedicated high‐resolution beamline have been constructed at RI beam factory and commissioned in 2009. Lateral and angular dispersion matching conditions were achieved simultaneously for a primay beam with a momentum spread of 0.1% and an emittance of 3π mm⋅mrad (σ). An overview of the spectrometer and the beam‐line, preliminary results from the commissioning runs, and future experimental plan with the system are described.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    1
    References
    1
    Citations
    NaN
    KQI
    []