Anchor rope composite pile structure as major structure stand
2015
The utility model relates to an anchor rope composite pile structure as major structure stand, including a precast pile and the anchor rope of bottom anchor in the ground, anchor noose is intracardiac in precast pile vertical, the inside steel reinforcement cage that is equipped with of precast pile, the inside slip casting material that fills of precast pile. The utility model has the advantages of it is following: economize on the use of funds, " one anchor " has saved too much anchor rope, and process flow such as mud off make construction cycle shorten, can regard as the atress component of major structure, need not reconstruct the supporting member, and the stock is small in quantity, practice thrift the cost, the drilling bored concrete pile appears in the work progress the hole of collapsing, undergauge, disconnected stake, intermediate layer scheduling problem can effectively be avoided to this kind of composite pile, and it is guaranteed to become the stake quality, compare with general tubular pile, hoist and mount steel reinforcement cage and concreting in the tubular pile, the ability that makes the anti horizontal loading of tubular pile is showing and is improving to its single pile bearing capacity also improve by a wide margin, the pollution of dado mud to the surrounding environment has been avoided.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI