Strengthening of concrete bridge over the river Nossan: new pre-stressing method - evaluation and development

2014 
The aim of this project was to evaluate the innovative strengthening method (called here Chalmers/TENROC method) on the bridge over Nossan (Nossan at S. Harene church, bridge no. 15-376-1) with regard to practical production experience and sustainability, as well as, propose ideas for further development of the method. The scope of this project was to present: 1) planning, logistics and assembly of pre-stressed laminate on the bridge, 2) environmental impact and LCC analysis. 3) material usage and adaptation of laminates for pre-stressing work 4) safety conditions for conducting on-site woks before and during pre-stressing of the laminates on a concrete bridge.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    2
    Citations
    NaN
    KQI
    []