Interregional Electric Power Planning Model Based on Sustainable Development of Wind Power
2015
AbstractChina’s wind power is primarily distributed in West China which is far away from the load center. Power from these wind farms is difficult to consume, so it needs to be transmitted to East China to extend its consumption area. To coordinate interregional power construction and to make full use of the interregional power generation resources, especially the wind electricity, a joint plan for an interregional power source and power grid construction is necessary. A mixed integer programming model of interregional electric power investment dynamic optimization is established for many reasons. The most important reasons are the optimal operating costs of power generation and the factors involved in interregional power planning. Such factors include load and electricity demand constraints, fuel cost volatility, installation cost changes of clean energy, carbon emissions price growth, and installed capacity constraints. The results simulated by general algebraic modeling system (GAMS) show that on the e...
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
35
References
4
Citations
NaN
KQI