Evaluation of a tunnel in Yunnan using CRD construction method

2019 
According to the surrounding rock conditions of Re Shuitang Tunnel NO.2, it is analyzed whether the CRD method is suitable for such surrounding rock conditions. By comparing and analyzing the distribution of plastic zone of surrounding rock during construction and the displacement deformation of tunnel monitoring point, the tunnel is constructed. The plastic zone of the middle arch and the arch is obviously changed, and should be reinforced. The settlement of the right vault and the side wall is larger than the left side, which is about 19.8% and 21.9%. According to the analysis results, the vault should be reinforced in advance during tunnel construction to prevent collapse and ensure construction safety, and provide reference for future construction.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []