CONSTRUCTION CONTROL INSTRUMENTATION USED DURING TUNNEL ENLARGEMENT

1976 
A geotechnical instrumentation program consisting of borehole extensometers and portable tape extensometer stations was effectively used to monitor concrete liner deformations and guide construction procedures during enlargement of a 75-year old Union Pacific Railroad tunnel in Wyoming. Enlargement involved excavation of the old concrete invert and placement of 5,941 ft of new concrete invert 6 ft lower in squeezing shales, fault zones and water-bearing sandstones. Instrumentation data were used to guide procedures for excavating the old invert, installation of temporary interior struts, underpinning existing liner walls, and placing the new concrete invert.