Magnet Design Studies for the Triumf Kaon Factory Proposal

1990 
TRIUMF is engaged on a one year Project Definition Study of its KAON factory proposal. This proposal calls for a total of 1800 magnets to be installed in three storage rings, two synchrotrons, beam transfer lines and experimental facilities to increase the present beam from 200 µA at 500 MeV to 100 µA at 30 GeV. The paper discusses the current design status concentrating on the ac booster synchrotron ring magnets which will be driven by biased dc current modulated at 50 Hz. Methods of estimating the core losses for this excitation, the coil eddy current losses and design and fabrication features of prototypes will be presented.