A hydroelectric station intake construction simulation of high slope excavation

2011 
By using the finite element method calculation model, the construction of high rock slope excavation analysis and simulation of construction process simulation, and with the monitoring results were analyzed. Feature points on the slope of the calculated displacement of the outer section layout view is consistent with the measured displacement, the bolt stress gauge measured and calculated in terms of size and rules are basically the same.